Revision history of "SCHOOL IN STEP WITH THE TIMES" (Q4821483)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 07:1407:14, 12 October 2024DG Regio talk contribs 45,050 bytes −3 Changed label, description and/or aliases in pt
  • curprev 07:1407:14, 12 October 2024DG Regio talk contribs 45,053 bytes +18 Set a claim value: summary (P836): O MIRAGLIA COMPREENSIVO INSTITUTO TEM SIDO ATIVO DURANTE ANOS NO REFORÇO DO SEU EQUIPAMENTO DIGITAL E NA REALIZAÇÃO DOS AMBIENTES TECNOLÓGICOS DESTINADOS AO ENSINO. O INSTITUTO NOS SEUS 2 EDIFÍCIOS DE FACTO EQUIPADO NUM PLEXUS BUILDING SOGLIANO UM LIM LABORATÓRIO COMPUTADOR EM CLASSROOMS UMA REDE WIFI NÃO SUFICIENTE PARA COBERTURAR AS NECESSIDADES DA ESCOLA. Noutra MIRÁGLIA DE CONSTRUÇÃO DE 1 LABORADOR DE LÍNGUAS 2 LABORATÓRIOS COMPUTADORES E ALGUNS...

20 March 2024

12 June 2023

26 April 2023

10 April 2023