Revision history of "UPGRADING THE 5S METHOD IN RAIPAPER S.R.L." (Q4774743)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 05:2905:29, 12 October 2024DG Regio talk contribs 45,027 bytes +1 Changed label, description and/or aliases in pt
  • curprev 05:2905:29, 12 October 2024DG Regio talk contribs 45,026 bytes −2 Set a claim value: summary (P836): O PROJECTO DE REFORÇO DO MÉTODO 5S NA RAIPAPER S.R.L. APRESENTADO PELA RAIPAPER S.R.L., BASEADO NA LINHA DE INTERVENÇÃO 1, ESTÁ DESTINADO A 9 TRABALHADORES E TRABALHADORES TRABALHADORES TRABALHADOS NA SOCIEDADE PROPOSTA E DIVIDO EM 2 PASES: — 60 HORAS DE PRODUÇÃO LEAN — 40 HORAS DE GESTÃO DE PROJETOS ESTÁ TAMBÉM PREVISTA UMA «ATUALIZAÇÃO DA IGUALDADE DE OPORTUNIDADES E SEGURANÇA NO LOCAL DE TRABALHO» DE 12 HORAS DESTINADA A MELHORAR O BEM-ESTAR PSIQ...

7 March 2024

10 June 2023

26 April 2023

10 April 2023