Revision history of "ENERGY REQUALIFICATION OF THE BUILDING ENVELOPE AND TECHNICAL INSTALLATIONS OF THE BUILDING HEADQUARTERS OF THE COMMISSARIAT OF PUBLIC SECURITY — COURSE BRIZOLARA 5 CHIAVARI" (Q4771353)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 05:2005:20, 12 October 2024DG Regio talk contribs 32,070 bytes −8 Changed label, description and/or aliases in pt
  • curprev 05:2005:20, 12 October 2024DG Regio talk contribs 32,078 bytes +16 Set a claim value: summary (P836): O PROJECTO ENVOLVE A CONSTRUÇÃO ENERGÉTICA DO ENVELOPE DE EDIFÍCIOS E DOS SISTEMAS TECNOLÓGICOS DOS QUARTOS DE EDIFÍCIOS DO COMISSÁRIO DE SEGURANÇA PÚBLICA, SITE IN PROGRESS L. BRIZZOLARA 5 IN CHIAVARI. OS TRABALHOS INCLUIRAM A INSTALAÇÃO DE UMA FACA VENTILADA, A SUBSTITUIÇÃO DE TODAS AS JANEIRAS, A INSULAÇÃO DA Telha, A RENOVAÇÃO DOS SISTEMAS.

7 March 2024

11 June 2023

26 April 2023

10 April 2023