Revision history of "REALISATION OF A NEW MIXING PLANT FOR ‘GREEN’ DETERGENT LIQUIDS AND THE INTRODUCTION OF NEW PRODUCTION TECHNOLOGIES ON THE ATOMISATION TOWER AIMED AT SAVING ENERGY AND IMPROVING QUALITY." (Q4757009)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 04:3804:38, 12 October 2024DG Regio talk contribs 47,368 bytes +2 Changed label, description and/or aliases in pt
  • curprev 04:3804:38, 12 October 2024DG Regio talk contribs 47,366 bytes +34 Set a claim value: summary (P836): O PROJECTO DE INVESTIMENTO MATERIALIZAR-SE-Á EM DUAS INTERVENÇÕES EM DUAS INSTALAÇÕES DE PRODUÇÃO SEPARADAS QUE REPRESENTAM OS SÍTIOS DE PRODUÇÃO DA EMPRESA. —O PRIMEIRO INVESTIMENTO CONSISTE NA AQUISIÇÃO, INSTALAÇÃO E FUNCIONAMENTO DE UMA NOVA LINHA DE PRODUÇÃO CONSTITUÍDA POR DOIS NOVOS MISSIONÁRIOS E NOVOS TANKS PARA UMA NOVA LINHA DE PRODUÇÃO AUTOMÁTICA DESTINADA À PRODUÇÃO DE NOVOS PRODUTOS «VERDES» DA LINHA «BIOPURA».-O SEGUNDO INVESTIMENTO CO...

7 March 2024

11 June 2023

26 April 2023

10 April 2023