Revision history of "REDEVELOPMENT OF HOTEL STRUCTURE WITH RAISING OF THE QUALITY STANDARDS INSIDE THE ROOMS AND COMMON AREAS. REALISATION OF SUN TERRACE AND ENTERTAINMENT. TECHNOLOGICAL UPDATE. THE PROJECT WILL THEREFORE DEVELOP A STRUCTURAL REDEVELOPMENT WITH THE ESTABLISHM" (Q4755622)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 14:3014:30, 12 October 2024DG Regio talk contribs 35,982 bytes −11 Changed label, description and/or aliases in pt
  • curprev 14:3014:30, 12 October 2024DG Regio talk contribs 35,993 bytes −11 Set a claim value: summary (P836): REDESENVOLVIMENTO DA ESTRUTURA HOTEL COM O AUMENTO DAS NORMAS DE QUALIDADE NO INTERIOR DAS QUARTAS E DAS ZONAS COMUNS. REALIZAÇÃO DO TERRAÇO SOLAR E ENTRETENIMENTO. ATUALIZAÇÃO TECNOLÓGICA. O PROJECTO DESENVOLVERÁ, POR CONSEGUINTE, UM DESENVOLVIMENTO ESTRUTURAL COM A CRIAÇÃO DE NOVOS SERVIÇOS E ESPAÇOS PARA OS CONVIDADOS.

22 March 2024

11 June 2023

26 April 2023

10 April 2023