Revision history of "CONSOLIDATION WORKS ON THE SIDE OF MONTE DELL’ABITATO" (Q4752974)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 04:3204:32, 12 October 2024DG Regio talk contribs 29,954 bytes +4 Changed label, description and/or aliases in pt
  • curprev 04:3204:32, 12 October 2024DG Regio talk contribs 29,950 bytes +42 Set a claim value: summary (P836): O projecto destina-se a garantir a existência de algumas superfícies na montanha URZULEI, através da instalação de novas barreiras antiparamassicas, da criação de um sistema de recolha de água branca e da escala e estabilização das bolhas. ESTÁ TAMBÉM PREVISTO O ACORDO DO RIO SA PEDRA LADA E A RECONSTRUÇÃO DA TRANSFERÊNCIA DO RIO NURALÊ NA VIA SASSARI.

22 March 2024

11 June 2023

26 April 2023

10 April 2023