Revision history of "Improving the connection and accessibility of the south of the city with the Battery Park" (Q4690246)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 13:5113:51, 12 October 2024DG Regio talk contribs 57,896 bytes +1 Changed label, description and/or aliases in pt
  • curprev 13:5113:51, 12 October 2024DG Regio talk contribs 57,895 bytes +26 Set a claim value: summary (P836): A operação consiste em resolver a acessibilidade pedonal entre a Avenida Carlota Alessandri, na altura do pavimento em frente ao cruzamento com a rua Ciudad de Porcuna, e o acesso sul ao Parque Municipal de La Batería, através de uma estrutura de passarela e a instalação de um elevador panorâmico que salva a elevação de 33,90 m. existente.O elevador estará localizado no sopé da encosta sul do parque municipal de La Batería, na Avenida Carlota Alessa...

23 March 2024

20 December 2023

12 June 2023

10 June 2023

27 February 2023