Revision history of "Gymnasium School no.15, Timişoara — Rehabilitation and real estate existing ground floor, body B — 2 storerooms and ground floor workshop resulting in building ground floor + 1 Floor, educational spaces (functional room and classes) and thermal rehab" (Q4608700)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

5 June 2024

22 March 2024

20 June 2023

10 June 2023

21 February 2023