Revision history of "DS Activators II 2021-2022" (Q4565515)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:4711:47, 12 October 2024DG Regio talk contribs 28,722 bytes +10 Set a claim value: summary (P836): Projeto de acompanhamento: CZ.03.1.51/0.0/0.0/17_073/0008494 Local de realização: Senice na Hané, Nádražní 350, 783 45 Senice on Hané Capacidade do grupo de crianças 12 Calendário de execução: a partir de 01. 01. 2021 a 30. 06. 2022 Forma do grupo de crianças: grupo de crianças para o público

23 March 2024

15 January 2024

11 June 2023

20 February 2023

13 February 2023