Revision history of "Construction of a photovoltaic installation with a power of 94.20 kW on the roof of the Rural Bakery building in Knapa." (Q4422941)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 00:5600:56, 12 October 2024DG Regio talk contribs 174,190 bytes −4 Changed label, description and/or aliases in pt
  • curprev 00:5600:56, 12 October 2024DG Regio talk contribs 174,194 bytes +4 Set a claim value: summary (P836): O objetivo do projeto é aumentar a quantidade de energia obtida a partir de fontes renováveis utilizando instalações fotovoltaicas, o que reduzirá as emissões de gases com efeito de estufa. O investimento está localizado na cidade de Knapy, no município de Baranów Sandomierski. A recorrente tenciona adquirir e instalar uma instalação fotovoltaica de 94,50 kWp no âmbito do projeto. O projeto consistirá em duas fases da construção da instalação, ou se...

7 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

  • curprev 22:0422:04, 2 March 2023DG Regio talk contribs 171,734 bytes −49 Changed label, description and/or aliases in lv, it, da, sk, el, cs, et, fr, ga, ro, hu, pt, sv, fi, lt, sl, hr, nl, es, mt, de, and other parts

21 February 2023

29 November 2022

27 October 2022

26 October 2022

24 October 2022

21 October 2022