Revision history of "Construction of a photovoltaic farm with a total capacity of 460.56 kWp together with the necessary technical infrastructure on dz. no. 384/2 in Lubycza Królewska, Lubycza Królewska" (Q4419562)
Jump to navigation
Jump to search
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.