Revision history of "Construction and commissioning of a new large-capacity ferry on the Maroni" (Q4299173)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 23:3023:30, 11 October 2024DG Regio talk contribs 48,049 bytes +4 Changed label, description and/or aliases in pt
  • curprev 23:3023:30, 11 October 2024DG Regio talk contribs 48,045 bytes +16 Set a claim value: summary (P836): A construção da nova lixeira anfidrómica no Maroni continua o seu curso. Este projeto responde ao eixo 1 do Programa Interreg de Cooperação Amazónica (IACP) relativo ao reforço da oferta de transporte na zona de cooperação transfronteiriça. Este projeto de ferry de maior capacidade no Maroni destina-se a absorver o aumento real e futuro da população em ambas as margens, incluindo as necessidades para a circulação de mercadorias e pessoas. Responde i...

26 March 2024

19 June 2023

11 June 2023

30 November 2022

7 October 2022

22 June 2022

20 June 2022

  • curprev 18:5518:55, 20 June 2022DG Regio talk contribs 7,642 bytes +1,142 Changed an Item: Moving texts from cs to fr
  • curprev 18:5518:55, 20 June 2022DG Regio talk contribs 6,500 bytes −1,142 Removed claim: summary (P836): La construction du nouveau bac amphidrome sur le Maroni poursuit son cours. Ce projet répond à l’axe 1 du Programme de Coopération Interreg Amazonie (PCIA) concernant le renforcement de l’offre de transport au sein de l’espace de coopération transfrontalier. Ce projet de ferry d’une plus grande capacité sur le Maroni a pour objectif d’absorber l’augmentation effective et à venir de la population des deux rives, et notamment les besoins en mati...
  • curprev 18:5518:55, 20 June 2022DG Regio talk contribs 7,642 bytes 0 Changed label, description and/or aliases in cs, fr: Change label language

15 June 2022

  • curprev 09:3209:32, 15 June 2022DG Regio talk contribs 7,642 bytes +1,142 Created claim: summary (P836): La construction du nouveau bac amphidrome sur le Maroni poursuit son cours. Ce projet répond à l’axe 1 du Programme de Coopération Interreg Amazonie (PCIA) concernant le renforcement de l’offre de transport au sein de l’espace de coopération transfrontalier. Ce projet de ferry d’une plus grande capacité sur le Maroni a pour objectif d’absorber l’augmentation effective et à venir de la population des deux rives, et notamment les besoins en matièr...
  • curprev 09:3209:32, 15 June 2022DG Regio talk contribs 6,500 bytes +145 Changed label, description and/or aliases in cs

10 June 2022