Revision history of "FURTHER WORKS TO SECURE THE WALLS FACING VIA ANICIA AND VIA MAZZINI AND THE BELL TOWER BY MEANS OF APPROPRIATE SCAFFOLDING. REMOVAL OF THE RUBBLE OF THE BASILICA OF SAN BENEDETTO." (Q4279978)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 21:5921:59, 11 October 2024DG Regio talk contribs 45,281 bytes +11 Changed label, description and/or aliases in pt
  • curprev 21:5921:59, 11 October 2024DG Regio talk contribs 45,270 bytes +9 Set a claim value: summary (P836): Prosseguem os trabalhos para assegurar os muros entre a ANICIA e a MAZZINI, bem como a torre do poço, através de uma repartição adequada. REMOÇÃO DA RUBRICA DA BÁSILA DE SAN BENEDETTO. FASE 1 "INTERVENÇÕES DESTINADAS À SEGURANÇA, À CONSTRUÇÃO E À REALIZAÇÃO DE INVESTIGAÇÕES PRELIMINARES. SUBFASE 1

7 March 2024

14 June 2023

10 June 2023

26 April 2023

8 April 2023

2 September 2022

23 July 2022

  • curprev 04:0504:05, 23 July 2022DG Regio talk contribs 41,237 bytes +27,177 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

6 February 2022

4 February 2022

3 February 2022

2 February 2022