Revision history of "TECHNICAL DESIGN 4.0 WITH THE BIM METHODOLOGY" (Q4242748)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

15 October 2024

  • curprev 17:5717:57, 15 October 2024DG Regio talk contribs 59,796 bytes +3 Changed label, description and/or aliases in pt
  • curprev 17:5717:57, 15 October 2024DG Regio talk contribs 59,793 bytes −42 Set a claim value: summary (P836): O PROJETO, "O DESIGN TÉCNICO 4.0 COM A METODOLOGIA BIM É O RESULTADO DAS NECESSIDADES DE FORMAÇÃO RESULTANTES DA EXECUÇÃO NA IQT CONSULTING S.P.A, DE UMA EMPRESA DE ENGENHARIA ESPECIALIZADA EM REDES DE INFRAESTRUTURAS PARA TELECOMUNICAÇÕES, DE UMA ARQUITETURA DE SISTEMAS DE RETALHO E DE CENTROS DE GESTÃO, DE UMA GESTÃO DE GRANDES LONDAS E DE SISTEMAS DE ÁGUA INTEGRADA, DE UMA METODOLOGIA DE CONCEÇÃO DIGITADA EM BIM BASEADA EM CLOUD QUE DEFINA NOVOS...

23 March 2024

21 June 2023

12 June 2023

26 April 2023

8 April 2023

1 September 2022

22 July 2022

  • curprev 13:4713:47, 22 July 2022DG Regio talk contribs 56,337 bytes +38,821 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

6 February 2022

4 February 2022

3 February 2022

2 February 2022

1 February 2022