Revision history of "NEW AUTOMATED WAREHOUSE SYSTEM IN METAL3 IN OPTICS 4.0" (Q4241886)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

15 October 2024

  • curprev 17:5117:51, 15 October 2024DG Regio talk contribs 59,528 bytes +4 Changed label, description and/or aliases in pt
  • curprev 17:5117:51, 15 October 2024DG Regio talk contribs 59,524 bytes +58 Set a claim value: summary (P836): OS SISTEMAS DO PROJETO DA — NECESSIDADE DE INTERVENÇÃO NA — ZONA DE ENTREPOSTO PARA: REDUZIR OS CUSTOS DE GESTÃO POR OPTIMIZAÇÃO DAS MATÉRIAS-PRIMAS E DECLARAÇÕES DE PRODUÇÃO, OPTIMIZAR O PLANEAMENTO DA PRODUÇÃO EM CONFORMIDADE COM AS MATÉRIAS-PRIMAS DISPONIBILIZADAS, GERIR OS TEMPOS DE CONTRATO POR REDUÇÃO DA DIMENSÃO E MANUTENÇÃO DA QUALIDADE DO PRODUTO, OPTIMIZAR OS FLUXOS DE INFORMAÇÃO EM TODA A EMPRESA, REDUZIR OS RESÍDUOS E REDUZIR/REDUZIR OS...

22 March 2024

10 June 2023

26 April 2023

8 April 2023

5 September 2022

22 July 2022

  • curprev 13:3213:32, 22 July 2022DG Regio talk contribs 55,454 bytes +38,053 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

6 February 2022

4 February 2022

3 February 2022

2 February 2022

1 February 2022