Revision history of "SUPERIOR TECHNICIAN FOR ENERGY SAVING IN SUSTAINABLE BUILDING — BUILDING MANAGER VERONA F VR- ENERGY EFFICIENCY AREA- SCOPE 1.2 PROCESSES AND SYSTEMS WITH HIGH EFFICIENCY AND ENERGY SAVING" (Q4241338)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

15 October 2024

  • curprev 17:4917:49, 15 October 2024DG Regio talk contribs 49,276 bytes +13 Changed label, description and/or aliases in pt
  • curprev 17:4917:49, 15 October 2024DG Regio talk contribs 49,263 bytes +1 Set a claim value: summary (P836): O projeto prevê 1200 horas na câmara e 800 horas de interferências, distribuídas ao longo dos dois anos. NO PRIMEIRO ANO, DE SETEMBRO/OUTUBRO A PODE (700 HORAS), SEGUIR À INTERNAÇÃO NOS MESES DE JUNHO E JULHO (320 HORAS). No segundo ano, as lições são dadas de setembro a março (500 horas), segue-se a entrada nos meses de março, abril, maio, junho (480 horas) os exames Diploma tomar lugar em julho.

22 March 2024

21 June 2023

12 June 2023

26 April 2023

8 April 2023

1 September 2022

22 July 2022

  • curprev 13:2213:22, 22 July 2022DG Regio talk contribs 45,242 bytes +30,444 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

6 February 2022

4 February 2022

3 February 2022

2 February 2022

1 February 2022