Revision history of "Copy — Installation of a solar panel system at the site of MOLNÁR-AUTÓ Kft. in Csorna" (Q3935974)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 01:5401:54, 11 October 2024DG Regio talk contribs 94,188 bytes +14 Changed label, description and/or aliases in pt
  • curprev 01:5401:54, 11 October 2024DG Regio talk contribs 94,174 bytes +12 Set a claim value: summary (P836): O seguinte desenvolvimento será realizado durante o projeto: Instalação do sistema solar. Um sistema solar com uma capacidade total de 49,6 kWp instalado no telhado está instalado. O projeto foi devidamente preparado até à data durante a preparação do projeto. Convidámos um perito com privilégios SZÉS6 da Câmara de Engenheiros Húngara, que é independente da nossa empresa, para preparar os cálculos e declarações de energia necessários para a apresent...

20 March 2024

19 June 2023

11 June 2023

13 August 2022

  • curprev 01:0501:05, 13 August 2022DG Regio talk contribs 93,437 bytes +71,792 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, hu, nl, fr, de, it, es, and other parts: Adding translations: et, lt, it, hr, el, sk, fi, pl, nl, cs, lv, ga, sl, es, bg, mt, pt, da, ro, de, sv,

14 February 2022

13 February 2022

10 February 2022

8 February 2022

  • curprev 22:0022:00, 8 February 2022DG Regio talk contribs 18,317 bytes +3,093 Changed an Item: Adding English translations
  • curprev 22:0022:00, 8 February 2022DG Regio talk contribs 15,224 bytes −3,093 Removed claim: summary (P836): The following development will be carried out during the project: Installation of solar system. A solar system with a total capacity of 49.6 kWp installed on the roof is installed. The project has been properly prepared to date during the preparation of the project. We have invited an expert with SZÉS6 privileges from the Hungarian Chamber of Engineers, which is independent of our company, to prepare the energy calculations and declarations...
  • curprev 21:5821:58, 8 February 2022DG Regio talk contribs 18,317 bytes +3,093 Changed an Item: Adding English translations

7 February 2022

15 January 2022

14 January 2022

16 December 2021

15 December 2021

9 December 2021

8 December 2021

7 December 2021

6 December 2021

5 December 2021

3 December 2021