Revision history of "Complex energy renovation at the headquarters of “Mikó” Kft." (Q3935710)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 04:1604:16, 9 October 2024DG Regio talk contribs 56,508 bytes +2 Changed label, description and/or aliases in pt
  • curprev 04:1604:16, 9 October 2024DG Regio talk contribs 56,506 bytes +23 Set a claim value: summary (P836): Paredes de fachada com retromontagem de painéis sanduíche de 100 mm de espessura, substituição da barreira de abertura por uma nova estrutura de caixa de plástico, instalação de um sistema de painéis solares (59,85 kWp): Painel solar: 133 Pcs Longi LR4-72HPH 450 Wp módulo monocristalino. 103 páginas D, 30 páginas K, 2094x1038x35 mm 144 células com tolerância de 0+ 5 W, tamanho: Painel solar monocristalino de 35 mm 23,5 kg Inversor: Huawei Sun2000-50...

22 March 2024

19 June 2023

11 June 2023

13 August 2022

  • curprev 00:5800:58, 13 August 2022DG Regio talk contribs 55,758 bytes +39,147 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, hu, nl, fr, de, it, es, and other parts: Adding translations: et, lt, it, hr, el, sk, fi, pl, nl, cs, lv, ga, sl, es, bg, mt, pt, da, ro, de, sv,

14 February 2022

13 February 2022

10 February 2022

8 February 2022

7 February 2022

15 January 2022

14 January 2022

16 December 2021

15 December 2021

9 December 2021

8 December 2021

7 December 2021

6 December 2021

5 December 2021

3 December 2021