Revision history of "Building energy development using renewable energy at METALLUX Zrt." (Q3935682)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 16:2516:25, 9 October 2024DG Regio talk contribs 100,756 bytes +5 Changed label, description and/or aliases in pt
  • curprev 16:2516:25, 9 October 2024DG Regio talk contribs 100,751 bytes −5 Set a claim value: summary (P836): 1. Arquitetura A fachada do edifício está equipada com isolamento térmico dryvit. A espessura das telhas de isolamento térmico Austrotherm AT-H80 na fachada é de 150 mm, que está ligado exatamente à estrutura da parede. O plinto recebe um isolamento térmico EPS de 150 mm de espessura (Austrotherm Expert Fix). A placa de isolamento térmico Austrotherm AT-N100 EPS é colocada no plano superior da laje. A parede do pedestal do iluminador é isolada termi...

7 March 2024

19 June 2023

11 June 2023

13 August 2022

  • curprev 00:5800:58, 13 August 2022DG Regio talk contribs 100,032 bytes +77,921 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, hu, nl, fr, de, it, es, and other parts: Adding translations: et, lt, it, hr, el, sk, fi, pl, nl, cs, lv, ga, sl, es, bg, mt, pt, da, ro, de, sv,

14 February 2022

13 February 2022

10 February 2022

8 February 2022

7 February 2022

15 January 2022

14 January 2022

16 December 2021

15 December 2021

9 December 2021

8 December 2021

7 December 2021

6 December 2021

5 December 2021

3 December 2021