Revision history of "Building energy improvements at M-V Consulting Ltd. aimed at using renewable energy and increasing energy efficiency." (Q3935297)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 01:5701:57, 10 October 2024DG Regio talk contribs 130,401 bytes +4 Changed label, description and/or aliases in pt
  • curprev 01:5701:57, 10 October 2024DG Regio talk contribs 130,397 bytes +108 Set a claim value: summary (P836): A execução das obras de renovação/reconstrução deve cumprir os requisitos tecnológicos e de garantia da qualidade, os requisitos energéticos para cada estrutura de edifício e a redução da procura de energia do edifício através da utilização de fontes de energia renováveis. Planeamos a adaptação de um isolamento térmico de 15 cm de espessura na fachada do edifício A (aderência + fixação mecânica). As dimensões das cavilhas do isolamento térmico devem...

7 March 2024

11 June 2023

13 August 2022

  • curprev 00:4700:47, 13 August 2022DG Regio talk contribs 129,564 bytes +103,555 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, hu, nl, fr, de, it, es, and other parts: Adding translations: et, lt, it, hr, el, sk, fi, pl, nl, cs, lv, ga, sl, es, bg, mt, pt, da, ro, de, sv,

13 July 2022

14 February 2022

13 February 2022

10 February 2022

8 February 2022

  • curprev 22:0122:01, 8 February 2022DG Regio talk contribs 21,100 bytes +4,318 Changed an Item: Adding English translations
  • curprev 22:0122:01, 8 February 2022DG Regio talk contribs 16,782 bytes −4,318 Removed claim: summary (P836): The implementation of renovation/reconstruction works shall comply with technological and quality assurance requirements, the energy requirements for each building structure and the reduction of the energy demand of the building through the use of renewable energy sources. We plan the retrofitting of 15 cm thick thermal insulation on the facade of building A (adhesion + mechanical attachment). The size of the dowels of the thermal insulation s...
  • curprev 21:5821:58, 8 February 2022DG Regio talk contribs 21,100 bytes +4,318 Changed an Item: Adding English translations

7 February 2022

15 January 2022

14 January 2022

16 December 2021

15 December 2021

9 December 2021

8 December 2021

7 December 2021

6 December 2021

5 December 2021

3 December 2021