Revision history of "Installation of solar system at Dancsi & Partner Ltd. Industrial Park site" (Q3935206)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 12:5512:55, 11 October 2024DG Regio talk contribs 64,976 bytes +39 Changed label, description and/or aliases in pt
  • curprev 12:5512:55, 11 October 2024DG Regio talk contribs 64,937 bytes −25 Set a claim value: summary (P836): Como parte do desenvolvimento, a empresa gostaria de instalar um sistema solar no edifício da lavadora office-kamion localizada em seu local de mako. A empresa pretende realizar o projeto entre 01.07.2020-2022.06.30. A atividade de investimento não está sujeita a autorização, os desenhos e as especificações técnicas estão disponíveis. O projecto envolve a instalação de um sistema de painéis solares de 49,83 kWp. O sistema consiste em 1 inversor Kaco...

20 March 2024

11 June 2023

13 August 2022

  • curprev 00:4500:45, 13 August 2022DG Regio talk contribs 64,237 bytes +46,416 Changed label, description and/or aliases in de, nl, it, es, et, lt, hr, el, sk, fi, pl, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, hu, fr, and other parts: Adding translations: et, lt, it, hr, el, sk, fi, pl, nl, cs, lv, ga, sl, es, bg, mt, pt, da, ro, de, sv,

14 February 2022

13 February 2022

10 February 2022

8 February 2022

  • curprev 22:0222:02, 8 February 2022DG Regio talk contribs 15,743 bytes +1,915 Changed an Item: Adding English translations
  • curprev 22:0222:02, 8 February 2022DG Regio talk contribs 13,828 bytes −1,915 Removed claim: summary (P836): As part of the development, the Company would like to install a solar system on the building of the office-kamion washer located at its mako site. The Company intends to carry out the project between 01.07.2020-2022.06.30. The investment activity is not subject to authorisation, the drawings and technical specifications are available. The project involves the installation of a 49,83 kWp solar panel system. The system consists of 1 Kaco bluepla...
  • curprev 21:5821:58, 8 February 2022DG Regio talk contribs 15,743 bytes +1,915 Changed an Item: Adding English translations

7 February 2022

15 January 2022

14 January 2022

16 December 2021

15 December 2021

9 December 2021

8 December 2021

7 December 2021

6 December 2021

5 December 2021

3 December 2021