Revision history of "Installation of solar system at Dancsi & Partner Ltd. At Arad road site" (Q3935193)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

11 June 2023

5 September 2022

14 February 2022

13 February 2022

10 February 2022

8 February 2022

  • curprev 22:0122:01, 8 February 2022DG Regio talk contribs 15,412 bytes +1,735 Changed an Item: Adding English translations
  • curprev 22:0122:01, 8 February 2022DG Regio talk contribs 13,677 bytes −1,735 Removed claim: summary (P836): As part of the development, the Company would like to install a solar system on the building of the assembly hall warehouse located in Makó, Aradi út 119. The Company intends to carry out the project between 01.07.2020-2022.06.30. The investment activity is not subject to authorisation, the drawings and technical specifications are available. The project involves the installation of a 17.82 kWp solar panel system. The system consists of 1 Kaco...
  • curprev 21:5821:58, 8 February 2022DG Regio talk contribs 15,412 bytes +1,735 Changed an Item: Adding English translations

7 February 2022

15 January 2022

14 January 2022

16 December 2021

15 December 2021

9 December 2021

8 December 2021

7 December 2021

6 December 2021

5 December 2021

3 December 2021