Revision history of "Construction of a new innovative closed-system compost plant with 9 heat treatment tunnels and acquisition of technological equipment" (Q3913639)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 01:4101:41, 10 October 2024DG Regio talk contribs 82,778 bytes +2 Changed label, description and/or aliases in pt
  • curprev 01:4101:41, 10 October 2024DG Regio talk contribs 82,776 bytes −2 Set a claim value: summary (P836): Nos túneis de tratamento térmico, o produto final é descontaminado de agentes patogénicos e pragas através de controlos associados, condutas de ar, ventiladores, permutadores de calor e engenharia de edifícios (tratamento térmico). As correias transportadoras garantem a entrada e remoção nos túneis, juntamente com o carro de tradução instalado neles. A faringe garante a alimentação uniforme adequada do composto de primeira fase para o sistema de tra...

22 March 2024

19 June 2023

11 June 2023

5 September 2022

14 February 2022

13 February 2022

11 February 2022

10 February 2022

8 February 2022

7 February 2022

15 January 2022

14 January 2022

16 December 2021

14 December 2021

9 December 2021

8 December 2021

7 December 2021

5 December 2021

3 December 2021

2 December 2021