Revision history of "PROJECT FOR EXTENSION OF LINE 2 OF THE SOFIA METRO, SECTION “JAMES BAUCHER” TO “VITOSHA” MS — PHASE 2" (Q3878211)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 01:1901:19, 10 October 2024DG Regio talk contribs 88,582 bytes +4 Changed label, description and/or aliases in pt
  • curprev 01:1901:19, 10 October 2024DG Regio talk contribs 88,578 bytes +49 Set a claim value: summary (P836): A presente proposta diz respeito à fase 2 do projeto de extensão da linha 2 do metro de Sófia, secção «James Baucher» do Conselho de Ministros «Vitosha», com uma extensão de 1,3 km e uma estação de metro, incluída para financiamento ao abrigo do PO «Infraestruturas de transportes e de transportes» 2014-2020, uma vez que, através das possibilidades da chamada «fase inversa», a fase 1 é financiada ao abrigo do PO «Transportes» 2007-2013. O projeto inc...

7 March 2024

19 June 2023

11 June 2023

28 February 2023

19 July 2022

  • curprev 20:0220:02, 19 July 2022DG Regio talk contribs 87,365 bytes +55,443 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et, bg, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et,

20 May 2022

19 May 2022

18 February 2022

14 January 2022

13 January 2022

11 December 2021

6 December 2021

4 December 2021

3 December 2021

2 December 2021

  • curprev 21:4721:47, 2 December 2021DG Regio talk contribs 18,229 bytes +2,885 Created claim: summary (P836): This proposal concerns Phase 2 of the Sofia Metro Line 2 Extension Project, section “James Baucher” to the “Vitosha” Council of Ministers with a length of 1.3 km and 1 metro station, included for funding under OP “Transport and Transport Infrastructure” 2014-2020. as, through the possibilities of the so-called “reverse phase”, Phase 1 is financed under OP “Transport” 2007-2013. The project includes the underground section of Line 2 south of “Jam...
  • curprev 21:4721:47, 2 December 2021DG Regio talk contribs 15,344 bytes +171 Changed label, description and/or aliases in en: translated_label
  • curprev 10:1710:17, 2 December 2021DG Regio talk contribs 15,173 bytes +3 Changed label, description and/or aliases in en: Setting new description
  • curprev 10:1710:17, 2 December 2021DG Regio talk contribs 15,170 bytes +15,170 Created a new Item: importing one item from Bulgaria