Revision history of "Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage OOD — Vratsa" (Q3848883)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

19 June 2023

10 June 2023

28 February 2023

19 July 2022

  • curprev 09:4709:47, 19 July 2022DG Regio talk contribs 85,947 bytes +53,883 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et, bg, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et,

20 May 2022

19 May 2022

18 February 2022

14 January 2022

13 January 2022

10 December 2021

6 December 2021

4 December 2021

3 December 2021

2 December 2021

  • curprev 14:0614:06, 2 December 2021DG Regio talk contribs 18,596 bytes +2,801 Created claim: summary (P836): — According to the water supply component, it is foreseen: •for the town of Vratsa: reconstruction of a water supply pipeline from HP 13 000 m³ to HP 6 200 m³ with a length of 0.785 km;•for Vratsa: reconstruction and completion of a water supply network with a length of 23.025 km, construction of two new PRV shafts, as well as one new water meter shaft; •for Mezdra: reconstruction and completion of a 8.272 km water supply network, as well as the...
  • curprev 14:0614:06, 2 December 2021DG Regio talk contribs 15,795 bytes +166 Changed label, description and/or aliases in en: translated_label
  • curprev 01:3701:37, 2 December 2021DG Regio talk contribs 15,629 bytes +4 Changed label, description and/or aliases in en: Setting new description
  • curprev 01:3701:37, 2 December 2021DG Regio talk contribs 15,625 bytes +15,625 Created a new Item: importing one item from Bulgaria