Revision history of "Lot 18 “Road III-112 Dabova Mahala-Montana from km 10+ 500 to km 16+ 174, from km 20+ 579 to km 27+ 736.15, from km 29+ 675 to km 36+ 654.63 and from km 37+ 825 to km 47+ 806.74, with a total length of 29.793 km, Montana district”" (Q3835755)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 14:3214:32, 9 October 2024DG Regio talk contribs 96,195 bytes −1 Changed label, description and/or aliases in pt
  • curprev 14:3214:32, 9 October 2024DG Regio talk contribs 96,196 bytes +148 Set a claim value: summary (P836): O principal resultado que será alcançado com a realização do projeto é a reabilitação de troços rodoviários da estrada III-112, com um comprimento total de 29,793 km. Ao melhorar as qualidades operacionais e de transporte dos troços rodoviários existentes, garantirá a segurança e o conforto do tráfego para os residentes itinerantes das aldeias de Dabova Mahala, Studeno Buche, Smirnenski, Slavotinski, Dr. Josephovo e Brusarci, prolongando a vida expl...

12 March 2024

19 June 2023

10 June 2023

28 February 2023

19 July 2022

  • curprev 05:2905:29, 19 July 2022DG Regio talk contribs 94,887 bytes +61,731 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et, bg, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et,

20 May 2022

19 May 2022

18 February 2022

14 January 2022

13 January 2022

10 December 2021

6 December 2021

4 December 2021

3 December 2021

2 December 2021

  • curprev 11:5011:50, 2 December 2021DG Regio talk contribs 18,760 bytes +3,014 Created claim: summary (P836): The main result that will be achieved with the realisation of the project is rehabilitated road sections of road III-112 with a total length of 29.793 km. By improving the transport and operational qualities of the existing road sections will ensure traffic safety and comfort for the travelling residents of the villages of Dabova Mahala, Studeno Buche, Smirnenski, Slavotinski, Dr. Josephovo and Brusarci, prolonging the explosion life on the road...
  • curprev 11:5011:50, 2 December 2021DG Regio talk contribs 15,746 bytes +303 Changed label, description and/or aliases in en: translated_label

1 December 2021