Revision history of "Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage OOD, Pernik" (Q3834373)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 14:3214:32, 9 October 2024DG Regio talk contribs 86,469 bytes +50 Changed label, description and/or aliases in pt
  • curprev 14:3214:32, 9 October 2024DG Regio talk contribs 86,419 bytes 0 Set a claim value: summary (P836): Âmbito das obras de construção e reconstrução da infraestrutura de SAM: Aglomeração Pernik Reconstrução e construção de linhas de abastecimento de água — 14,3 kmExabilitação de 1 PS; Construção de 3 novas massas de água; Reabilitação e construção da rede de esgotos — 29 870 km e 1 816 OCS; Reconstrução da ETAR da aglomeração de Batanovtsi-Radomir: Conduta de água em trânsito para zona baixa — 2,2 km;Construção da rede de distribuição — 9,96 km e 624...

23 March 2024

19 June 2023

10 June 2023

28 February 2023

19 July 2022

  • curprev 05:0505:05, 19 July 2022DG Regio talk contribs 85,258 bytes +53,518 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et, bg, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et,

20 May 2022

19 May 2022

18 February 2022

14 January 2022

13 January 2022

10 December 2021

6 December 2021

4 December 2021

3 December 2021

2 December 2021

  • curprev 11:4711:47, 2 December 2021DG Regio talk contribs 18,613 bytes +2,851 Created claim: summary (P836): Scope of the works for construction and reconstruction of the WSS infrastructure: agglomeration Pernik Reconstruction and construction of water supply lines — 14.3 kmPexabilitation of 1 PS; Construction of 3 new water bodies; Rehabilitation and construction of sewerage network — 29.870 km and 1 816 SCOs; Reconstruction of WWTP BatanovtsiAgglomeration Radomir: Transit water pipeline for low zone — 2.2 km;Construction of distribution network — 9.9...
  • curprev 11:4711:47, 2 December 2021DG Regio talk contribs 15,762 bytes +163 Changed label, description and/or aliases in en: translated_label

1 December 2021