Revision history of "Improvement of the production capacity in KEMP AD" (Q3832924)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

10 June 2023

28 February 2023

19 July 2022

  • curprev 04:4404:44, 19 July 2022DG Regio talk contribs 59,838 bytes +36,432 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et, bg, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et,

20 May 2022

19 May 2022

18 May 2022

18 February 2022

14 January 2022

13 January 2022

10 December 2021

6 December 2021

4 December 2021

3 December 2021

2 December 2021

  • curprev 11:5211:52, 2 December 2021DG Regio talk contribs 15,445 bytes +1,794 Created claim: summary (P836): Kemp AD is an enterprise with over 15 years of experience in the production of massive and flexible installation, power and industrial cables, as well as telephone cables and wooden drums. The main problems we have and which we plan to solve with the implementation of the project are: A large part of the production equipment is obsolete and uses old technologies; Production costs are relatively high and need optimisation, we do not have enough p...
  • curprev 11:5211:52, 2 December 2021DG Regio talk contribs 13,651 bytes +108 Changed label, description and/or aliases in en: translated_label

1 December 2021