Revision history of "“Integrated Water Project for Burgas District”" (Q3832243)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 03:3403:34, 9 October 2024DG Regio talk contribs 90,785 bytes +12 Changed label, description and/or aliases in pt
  • curprev 03:3403:34, 9 October 2024DG Regio talk contribs 90,773 bytes +53 Set a claim value: summary (P836): O «Projeto Integrado de Água para a Região de Burgas» está preparado para construir infraestruturas que cumpram a legislação nacional e europeia no domínio da água potável, da descarga e do tratamento de águas residuais e aumentem a eficiência dos sistemas e das instalações. As atividades do projeto visam assegurar a conformidade com a Estratégia Nacional de Gestão e Desenvolvimento do Setor da Água na República da Bulgária e a Estratégia UE 2020 pa...

22 March 2024

28 June 2023

19 June 2023

10 June 2023

10 March 2023

9 March 2023

28 February 2023

26 January 2023

25 January 2023

19 July 2022

  • curprev 04:3504:35, 19 July 2022DG Regio talk contribs 86,953 bytes +54,433 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et, bg, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et,

20 May 2022

19 May 2022

18 February 2022

14 January 2022

13 January 2022

10 December 2021

6 December 2021

4 December 2021

3 December 2021

2 December 2021

  • curprev 10:2010:20, 2 December 2021DG Regio talk contribs 18,991 bytes +2,885 Created claim: summary (P836): The “Integrated Water Project for Burgas Region” is prepared to build infrastructure that will achieve compliance with national and European legislation in the field of drinking water, waste water discharge and treatment and increase the efficiency of systems and facilities. The project activities aim at achieving compliance with the National Strategy for Management and Development of the Water Sector in the Republic of Bulgaria and the EU 2020...
  • curprev 10:2010:20, 2 December 2021DG Regio talk contribs 16,106 bytes +109 Changed label, description and/or aliases in en: translated_label

1 December 2021