Revision history of "Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage EOOD, Vidin" (Q3832241)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

19 June 2023

10 June 2023

28 February 2023

19 July 2022

  • curprev 04:3504:35, 19 July 2022DG Regio talk contribs 56,306 bytes +33,793 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et, bg, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, hu, ga, sv, et,

20 May 2022

19 May 2022

18 February 2022

14 January 2022

13 January 2022

10 December 2021

6 December 2021

4 December 2021

3 December 2021

2 December 2021

  • curprev 10:2010:20, 2 December 2021DG Regio talk contribs 15,296 bytes +1,658 Created claim: summary (P836): In total, for the Vidin agglomeration, the following measures are foreseen:-by component Water supply: •replacement of the existing lead pipe ph900 mm with PVC_O pipes with diameter F630mm, L = 10.372 km with PN 12.5 atm;•replacement of the existing two etherite pipes f536 mm and of the existing two steel pipes f630 mm by f500 mm PVC_O pipes with PN 12.5 atm and total length L = 4.149 km; L total=14.521 km.-by component Wastewater collection is...
  • curprev 10:2010:20, 2 December 2021DG Regio talk contribs 13,638 bytes +163 Changed label, description and/or aliases in en: translated_label

1 December 2021