Revision history of "Aurelia Turbines production startup" (Q3751136)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 03:0503:05, 9 October 2024DG Regio talk contribs 45,053 bytes −6 Changed label, description and/or aliases in pt
  • curprev 03:0503:05, 9 October 2024DG Regio talk contribs 45,059 bytes −4 Set a claim value: summary (P836): O objetivo do projeto é instalar a unidade de produção da Aurelia Turbines Oy em Lappeenranta durante 2017 e 2018 e, assim, permitir o início da produção durante o verão de 2017 para as primeiras entregas de turbinas. O projecto é composto por três áreas: 1) aquisição de equipamento e máquinas necessários para a instalação e o arranque de uma instalação de produção, 2) instalação de um centro de ensaios e 3) instalações e ferramentas adquiridas para...

22 March 2024

9 June 2023

12 August 2022

  • curprev 05:3205:32, 12 August 2022DG Regio talk contribs 44,338 bytes +26,768 Changed label, description and/or aliases in et, lt, hr, el, sk, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fi, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 May 2022

18 May 2022

8 April 2022

13 January 2022

12 January 2022

4 December 2021

30 November 2021

  • curprev 14:1614:16, 30 November 2021DG Regio talk contribs 12,380 bytes +1,346 Created claim: summary (P836): Ziel des Projekts ist es, das Produktionswerk von Aurelia Turbines Oy in Lappeenranta in den Jahren 2017 und 2018 zu installieren und so die Produktion im Sommer 2017 für die ersten Turbinenlieferungen zu starten. Das Projekt besteht aus drei Bereichen: 1) Kauf von Ausrüstungen und Maschinen, die für die Installation und Inbetriebnahme einer Produktionsanlage erforderlich sind, 2) die Installation einer Prüfstelle und 3) die für die Verwaltung d...
  • curprev 14:1614:16, 30 November 2021DG Regio talk contribs 11,034 bytes +96 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 10:1310:13, 26 November 2021DG Regio talk contribs 10,938 bytes +1 Changed label, description and/or aliases in en: Setting new description
  • curprev 06:3906:39, 26 November 2021DG Regio talk contribs 10,937 bytes +1,357 Created claim: summary (P836): L’objectif du projet est d’installer l’usine de production d’Aurelia Turbines Oy à Lappeenranta en 2017 et 2018 et de permettre ainsi le démarrage de la production au cours de l’été 2017 pour les premières livraisons de turbines. 1) l’achat de l’équipement et de la machinerie nécessaires à l’installation et au démarrage d’une installation de production, 2) l’installation d’un centre d’essai, et 3) les locaux et les outils achetés pour la gestion...
  • curprev 06:3906:39, 26 November 2021DG Regio talk contribs 9,580 bytes +107 Changed label, description and/or aliases in fr: translated_label

24 November 2021

23 November 2021

22 November 2021