Revision history of "ACI NONM STANDING...THE LAND AT THE SERVICE OF MEN: THE MARAICHERS SOLIDARITY OF PROXIMITE 2" (Q3706739)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

7 December 2023

11 June 2023

12 August 2022

  • curprev 02:0902:09, 12 August 2022DG Regio talk contribs 62,478 bytes +42,338 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

31 January 2022

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 20:1820:18, 1 December 2021DG Regio talk contribs 12,994 bytes +2,110 Created claim: summary (P836): Die geplante Ausführung der Baustelle ist vom 03. April 2018 bis zum 30. April 2020. Nach zwei Jahren Bauzeit wiederholen das Centre Pénitentiaire de Ducos, der Pénitentiaire d’Insertion et de Probation (SPIP), die Association Solidarités Lamentinoises (ASL) und das Haus der Familien und Freunde von Inhaftierten (MAFAD) dieses Integrationsprojekt mit neuen Perspektiven für die ökologische/biologische Produktion. Für die Durchführung dieses Pro...

27 November 2021

  • curprev 13:5113:51, 27 November 2021DG Regio talk contribs 10,884 bytes −2,255 Removed claim: summary (P836): La période de réalization du chantier prévue est du 03 avril 2018 au 30 avril 2020. Après deux années de chantier, le Centre Pénitentiaire de Ducos, le Service Pénitentiaire d‚Insertion et de Probation(SPIP), l‘Association Solidarités Lamentinoises (ASL) et la Maison d‚Accueil des Familles et des Amis de Personnes détenues (MAFAD) réitèrent ce projet d‘insertion avec de nouvelles perspectives en termes de Personnes détenues (MAFAD) réitèrent...
  • curprev 07:5307:53, 27 November 2021DG Regio talk contribs 13,139 bytes +2,255 Created claim: summary (P836): La période de réalization du chantier prévue est du 03 avril 2018 au 30 avril 2020. Après deux années de chantier, le Centre Pénitentiaire de Ducos, le Service Pénitentiaire d‚Insertion et de Probation(SPIP), l‘Association Solidarités Lamentinoises (ASL) et la Maison d‚Accueil des Familles et des Amis de Personnes détenues (MAFAD) réitèrent ce projet d‘insertion avec de nouvelles perspectives en termes de Personnes détenues (MAFAD) réitèrent ce...
  • curprev 02:0902:09, 27 November 2021DG Regio talk contribs 10,884 bytes +153 Changed label, description and/or aliases in de: translated_label

24 November 2021

22 November 2021

  • curprev 13:0613:06, 22 November 2021DG Regio talk contribs 10,300 bytes +151 Changed label, description and/or aliases in en: translated_label
  • curprev 13:0613:06, 22 November 2021DG Regio talk contribs 10,149 bytes +1,971 Created claim: summary (P836): The planned construction period is from 03 April 2018 to 30 April 2020. After two years of construction, the Centre Penitentiary of Ducos, the Penitentiary Service of Insertion and Probation (SPIP), the Association Solidarités Lamentinoises (ASL) and the Home of Families and Friends of Detained Persons (MAFAD) reiterate this project of integration with new perspectives in terms of organic production. A total area of 6 000 m² is made available...
  • curprev 12:0812:08, 22 November 2021DG Regio talk contribs 8,178 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates

17 November 2021