Revision history of "Facilitate access to or return to employment for employees in integration within the framework of the Workshops and Integration Buildings" (Q3705081)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 00:2000:20, 11 October 2024DG Regio talk contribs 70,164 bytes +3 Changed label, description and/or aliases in pt
  • curprev 00:2000:20, 11 October 2024DG Regio talk contribs 70,161 bytes +15 Set a claim value: summary (P836): Na aplicação do regime: «Facilitar o acesso ou o regresso ao emprego dos trabalhadores integrados no contexto de projetos de integração», Formação e Desenvolvimento, na sua qualidade de estrutura empregadora Edifícios de Inserção e Gestores de Projetos, propõe três tipos de ação distintos, mas complementares, correspondentes a três locais de integração mobilizados em torno de duas áreas de intervenção: Preparação para o recomeço do emprego e viabili...

22 March 2024

7 December 2023

12 June 2023

12 August 2022

  • curprev 01:4601:46, 12 August 2022DG Regio talk contribs 65,667 bytes +45,382 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

31 January 2022

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 19:5919:59, 1 December 2021DG Regio talk contribs 13,137 bytes +2,105 Created claim: summary (P836): Bei der Umsetzung der Regelung: „Erleichterung des Zugangs oder der Rückkehr in die Beschäftigung von eingegliederten Arbeitnehmern im Rahmen der Eingliederungsarbeitsplätze“, Ausbildung und Entwicklung als Arbeitgeberstruktur Arbeitswerkstätten und Bauherr bietet drei verschiedene, aber komplementäre Arten von Maßnahmen an, die drei Eingliederungswerften um zwei Interventionsachsen entsprechen: Vorbereitung der Wiederaufnahme der Beschäftigung...

27 November 2021

  • curprev 13:3413:34, 27 November 2021DG Regio talk contribs 11,032 bytes −2,103 Removed claim: summary (P836): Dans la mise en œuvre du dispositif: „Faciliter l‚accès ou le retour à l‘emploi des salariés en insertion dans le cadre des chantiers d‚insertion“, Formation et Développement, en sa qualité de structure employeur Chantiers d‘insertion et de Maître d‚œuvre schlagen trois types d‘actions apartes mais complémentaires, Korrespondant à trois chantiers d‚insertion Mobilisés autour de deux axes d‘intervention vor: Préparer la reprise d‚emploi et perm...
  • curprev 07:4207:42, 27 November 2021DG Regio talk contribs 13,135 bytes +2,103 Created claim: summary (P836): Dans la mise en œuvre du dispositif: „Faciliter l‚accès ou le retour à l‘emploi des salariés en insertion dans le cadre des chantiers d‚insertion“, Formation et Développement, en sa qualité de structure employeur Chantiers d‘insertion et de Maître d‚œuvre schlagen trois types d‘actions apartes mais complémentaires, Korrespondant à trois chantiers d‚insertion Mobilisés autour de deux axes d‘intervention vor: Préparer la reprise d‚emploi et permet...
  • curprev 01:5801:58, 27 November 2021DG Regio talk contribs 11,032 bytes +216 Changed label, description and/or aliases in de: translated_label

24 November 2021

22 November 2021

  • curprev 12:5512:55, 22 November 2021DG Regio talk contribs 10,385 bytes +197 Changed label, description and/or aliases in en: translated_label
  • curprev 12:5512:55, 22 November 2021DG Regio talk contribs 10,188 bytes +2,016 Created claim: summary (P836): In the implementation of the scheme: “Facilitating access to or return to employment for employees who are integrated in the context of integration projects”, Training and Development, in its capacity as employer structure Insertion Buildings and Project Managers proposes three distinct but complementary types of action, corresponding to three integration sites mobilised around two areas of intervention: Preparing for the resumption of employmen...
  • curprev 12:0312:03, 22 November 2021DG Regio talk contribs 8,172 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates

17 November 2021