Revision history of "SUPERVISION AND SUPPORT OF THE PUBLIC IN THE FRAMEWORK OF A SITE IN GUIDEL" (Q3703962)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 00:2100:21, 11 October 2024DG Regio talk contribs 74,296 bytes +6 Changed label, description and/or aliases in pt
  • curprev 00:2100:21, 11 October 2024DG Regio talk contribs 74,290 bytes −10 Set a claim value: summary (P836): Esta operação envolve apenas uma ação, a saber, a supervisão e o apoio do público em dificuldade de integração no contexto do projeto de integração da Guidel. As 26 horas de trabalho semanal são repartidas por 4 dias, de segunda a quinta-feira, das 8h15m às 12h00m e das 13h00m às 16h45m, e às quartas-feiras, das 8h15m às 23h45m. Ao mesmo tempo, os trabalhadores beneficiam de um acompanhamento socioprofissional de 7 horas, que tem lugar às segundas-f...

7 March 2024

7 December 2023

12 August 2022

  • curprev 01:3001:30, 12 August 2022DG Regio talk contribs 71,406 bytes +49,897 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 19:4319:43, 1 December 2021DG Regio talk contribs 13,801 bytes +2,600 Created claim: summary (P836): Die vorliegende Maßnahme umfasst nur eine Aktion, nämlich die Betreuung und Begleitung von Personen, die sich in Schwierigkeiten bei der Eingliederung im Rahmen der Baustelle von Guidel befinden. Die 26 Wochenarbeitsstunden werden auf vier Tage verteilt, von Montag bis Donnerstag von 8.15 Uhr bis 12.00 Uhr und von 13.00 bis 16.45 Uhr und am Mittwoch von 8.15 bis 11.45 Uhr. Gleichzeitig profitieren die Arbeitnehmer von einer siebenstündigen sozi...

27 November 2021

  • curprev 12:4912:49, 27 November 2021DG Regio talk contribs 11,201 bytes −2,584 Removed claim: summary (P836): La présente opération ne comporte qu‚une seule action, à savoir l‘encadrement et l‚accompagnement de public en difficulté d‘insertion dans le cadre du chantier d’insertion de Guidel. Les 26 heures de travail hebdomadaire sont Réparties sur 4 jours, du lundi au jeudi de 8h15 à 12h et de 13h à 16h45 et le mercredi de 8h15 à 11h45. Les salariés bénéficient en parallèle d’un suivi social-professionnel à raison de 7 heures qui a lieu le lundi. UN...
  • curprev 01:5501:55, 27 November 2021DG Regio talk contribs 13,785 bytes +2,584 Created claim: summary (P836): La présente opération ne comporte qu‚une seule action, à savoir l‘encadrement et l‚accompagnement de public en difficulté d‘insertion dans le cadre du chantier d’insertion de Guidel. Les 26 heures de travail hebdomadaire sont Réparties sur 4 jours, du lundi au jeudi de 8h15 à 12h et de 13h à 16h45 et le mercredi de 8h15 à 11h45. Les salariés bénéficient en parallèle d’un suivi social-professionnel à raison de 7 heures qui a lieu le lundi. UN e...

26 November 2021

24 November 2021

22 November 2021

  • curprev 12:4712:47, 22 November 2021DG Regio talk contribs 10,608 bytes +133 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4712:47, 22 November 2021DG Regio talk contribs 10,475 bytes +2,360 Created claim: summary (P836): This operation involves only one action, namely the supervision and support of the public in difficulty of integration in the context of Guidel’s integration project. The 26 hours of weekly work are spread over 4 days, Monday to Thursday from 8:15 a.m. to 12 p.m. and from 1 p.m. to 4.45 p.m. and on Wednesdays from 8:15 a.m. to 11.45 p.m. At the same time, employees benefit from a 7-hour socio-professional follow-up, which takes place on Mondays...

17 November 2021