Revision history of "VIARHONA: DOUBLE-WAY BIKE PATH AV.RIPAILLE, RIPAILLE QUAY AND SHORE DOCK" (Q3702674)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

12 January 2024

10 June 2023

8 June 2023

10 March 2023

9 March 2023

12 August 2022

  • curprev 01:1101:11, 12 August 2022DG Regio talk contribs 43,585 bytes +31,150 Changed label, description and/or aliases in de, et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, it, es, and other parts: Adding translations: et, lt, it, hr, el, sk, fi, pl, hu, nl, cs, lv, ga, sl, es, bg, mt, pt, da, ro, de, sv,

30 May 2022

16 May 2022

  • curprev 14:5814:58, 16 May 2022Admin talk contribs 11,225 bytes −326 Removed claim: French Kohesio ID (P843): 12721
  • curprev 14:5814:58, 16 May 2022Admin talk contribs 11,551 bytes −1,205 Removed claim: summary (P836): L'operazione consiste nel proseguire lo sviluppo della rotta ViaRhôna nel comune di Thonon les Bains attraverso la costruzione di 1,660 km di strada verde a doppio senso nel periodo 2018-2020. Questo sviluppo è anche parte del programma globale di ciclismo Sud Léman, il piano turistico 2013-2020 del Consiglio Dipartimentale dell'Alta Savoia e più in generale Eurovéloroute17.
  • curprev 14:5814:58, 16 May 2022Admin talk contribs 12,756 bytes −1,198 Removed claim: summary (P836): The operation consists of continuing the development of the ViaRhôna route in the commune of Thonon les Bains by the realisation of 1.660 km of two-way green lane over the period 2018 to 2020. This development is also part of the overall South Geneva cycling programme, the tourism plan 2013-2020 of the Departmental Council of Haute Savoie and more broadly Eurovéloroute17.
  • curprev 14:5814:58, 16 May 2022Admin talk contribs 13,954 bytes −1,227 Removed claim: summary (P836): La operación consiste en continuar el desarrollo de la ruta ViaRhôna en el municipio de Thonon les Bains a través de la construcción de 1,660 km de carretera verde de doble vía durante el período 2018 a 2020. Este desarrollo también forma parte del programa mundial de ciclismo Sud Léman, el plan de turismo 2013-2020 del Consejo Departamental de Alta Saboya y, más en general, Eurovéloroute17.
  • curprev 14:5814:58, 16 May 2022Admin talk contribs 15,181 bytes −1,205 Removed claim: summary (P836): L'operazione consiste nel proseguire lo sviluppo della rotta ViaRhôna nel comune di Thonon les Bains attraverso la costruzione di 1,660 km di strada verde a doppio senso nel periodo 2018-2020. Questo sviluppo è anche parte del programma globale di ciclismo Sud Léman, il piano turistico 2013-2020 del Consiglio Dipartimentale dell'Alta Savoia e più in generale Eurovéloroute17.
  • curprev 14:5814:58, 16 May 2022Admin talk contribs 16,386 bytes −1,210 Removed claim: summary (P836): De exploitatie bestaat uit de voortzetting van de ontwikkeling van de ViaRhôna-route in de gemeente Thonon les Bains door de aanleg van 1,660 km aan dubbele groene weg in de periode 2018-2020. Deze ontwikkeling maakt ook deel uit van het wereldwijde Sud Léman fietsprogramma, het toerismeplan 2013-2020 van de departementsraad van Haute Savoie en meer in het algemeen Eurovéloroute17.
  • curprev 14:5814:58, 16 May 2022Admin talk contribs 17,596 bytes −1,193 Removed claim: summary (P836): Das Vorhaben besteht darin, die Umgestaltung der ViaRhôna-Route in der Gemeinde Thonon les Bains durch den Bau einer 1,660 km doppelwegigen Grünstraße im Zeitraum 2018 bis 2020 fortzusetzen. Dies ist Teil des Gesamtprogramms Süd-Léman-Fahrradrouten, des Tourismusplans 2013-2020 des Departementsrats der Haute Savoie und eines größeren Teils von Eurovéloroute17.
  • curprev 14:5814:58, 16 May 2022Admin talk contribs 18,789 bytes −1,210 Removed claim: summary (P836): The operation consists of continuing the development of the ViaRhôna route in the municipality of Thonon les Bains through the construction of 1.660 km of double-way green road over the period 2018 to 2020. This development is also part of the global Sud Léman cycling programme, the tourism plan 2013-2020 of the Departmental Council of Haute Savoie and more broadly Eurovéloroute17.
  • curprev 14:5814:58, 16 May 2022Admin talk contribs 19,999 bytes −414 Removed claim: beneficiary (P889): (Q3776563)
  • curprev 14:5814:58, 16 May 2022Admin talk contribs 20,413 bytes −406 Removed claim: budget (P474): 97,608.0 euro
  • curprev 14:5814:58, 16 May 2022Admin talk contribs 20,819 bytes −406 Removed claim: EU contribution (P835): 19,521.6 euro
  • curprev 14:2514:25, 16 May 2022DG Regio talk contribs 21,225 bytes +7,328 Merged Item from Q194096

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 13:1213:12, 1 December 2021DG Regio talk contribs 9,861 bytes +1,193 Created claim: summary (P836): Das Vorhaben besteht darin, die Umgestaltung der ViaRhôna-Route in der Gemeinde Thonon les Bains durch den Bau einer 1,660 km doppelwegigen Grünstraße im Zeitraum 2018 bis 2020 fortzusetzen. Dies ist Teil des Gesamtprogramms Süd-Léman-Fahrradrouten, des Tourismusplans 2013-2020 des Departementsrats der Haute Savoie und eines größeren Teils von Eurovéloroute17., translated_summary

27 November 2021

  • curprev 13:5913:59, 27 November 2021DG Regio talk contribs 8,668 bytes −1,243 Removed claim: summary (P836): L‚opération consiste à poursuivre l"aménagement de l‘itinéraire ViaRhôna dans la commune de Thonon les Bains par la réalization de 1,660 km de voie verte à double sens sur la période 2018 à 2020. CET aménagement s‚inscrit aussi bien dans le cadre du programme global de véloroute Sud Léman, du plan tourisme 2013-2020 du conseil Départemental de la Haute Savoie et plus largement d‘Eurovéloroute17., Removing translation
  • curprev 01:4901:49, 27 November 2021DG Regio talk contribs 9,911 bytes +1,243 Created claim: summary (P836): L‚opération consiste à poursuivre l"aménagement de l‘itinéraire ViaRhôna dans la commune de Thonon les Bains par la réalization de 1,660 km de voie verte à double sens sur la période 2018 à 2020. CET aménagement s‚inscrit aussi bien dans le cadre du programme global de véloroute Sud Léman, du plan tourisme 2013-2020 du conseil Départemental de la Haute Savoie et plus largement d‘Eurovéloroute17., translated_summary

26 November 2021

24 November 2021

22 November 2021

  • curprev 12:1712:17, 22 November 2021DG Regio talk contribs 8,096 bytes +131 Changed label, description and/or aliases in en: translated_label
  • curprev 12:1712:17, 22 November 2021DG Regio talk contribs 7,965 bytes +1,210 Created claim: summary (P836): The operation consists of continuing the development of the ViaRhôna route in the municipality of Thonon les Bains through the construction of 1.660 km of double-way green road over the period 2018 to 2020. This development is also part of the global Sud Léman cycling programme, the tourism plan 2013-2020 of the Departmental Council of Haute Savoie and more broadly Eurovéloroute17., translated_summary

17 November 2021