Revision history of "Ligero Project 2015 — Production of 5 convergent indicators followed by work and evaluation of wetland functionality" (Q3701411)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

7 December 2023

8 June 2023

5 September 2022

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 19:4119:41, 1 December 2021DG Regio talk contribs 9,402 bytes +1,003 Created claim: summary (P836): Erstellung von 5 konvergenten Indikatoren, gefolgt von Arbeiten und Bewertung der Funktionalität von Feuchtgebieten im Becken der Loire im Rahmen der Aktion 9 des DOMO Feder Loire., translated_summary

27 November 2021

  • curprev 13:3613:36, 27 November 2021DG Regio talk contribs 8,399 bytes −1,008 Removed claim: summary (P836): Produktion de 5 indicateurs convergents suivis de travaux et évaluation de la fonctionnalité des zoneshumes sur le Bassin de la Loire dans le cadre de l’action 9 du DOMO Feder Loire., Removing translation
  • curprev 01:4101:41, 27 November 2021DG Regio talk contribs 9,407 bytes +1,008 Created claim: summary (P836): Produktion de 5 indicateurs convergents suivis de travaux et évaluation de la fonctionnalité des zoneshumes sur le Bassin de la Loire dans le cadre de l’action 9 du DOMO Feder Loire., translated_summary

26 November 2021

24 November 2021

22 November 2021

17 November 2021