Revision history of "Emergency Measures 2017 — Water Resource Improvement — Combani Dam — Flood Evacuator Upgrade and Telemetry Design" (Q3700755)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 13:5713:57, 8 October 2024DG Regio talk contribs 43,115 bytes +10 Changed label, description and/or aliases in pt
  • curprev 13:5713:57, 8 October 2024DG Regio talk contribs 43,105 bytes +4 Set a claim value: summary (P836): Conclusão da modernização do Evacuador de Inundações da Barragem de Combani, a fim de modificar o evacuador, permitindo o armazenamento de um volume adicional (aumento do RN de um metro), garantindo simultaneamente um nível de segurança da barragem em conformidade com os requisitos regulamentares.

7 March 2024

12 January 2024

7 December 2023

11 June 2023

8 June 2023

12 August 2022

  • curprev 00:2400:24, 12 August 2022DG Regio talk contribs 39,832 bytes +26,017 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 12:3112:31, 1 December 2021DG Regio talk contribs 9,831 bytes +1,170 Created claim: summary (P836): Durchführung der Arbeiten an der Aufrüstung des Hochwasserableiters des Staudamms von Combani, um den Evakuator zu ändern, indem die Speicherung eines zusätzlichen Volumens (Erhöhung der NR um einen Meter) bei gleichzeitiger Gewährleistung eines den gesetzlichen Anforderungen entsprechenden Sicherheitsniveaus des Staudamms ermöglicht wird., translated_summary

27 November 2021

  • curprev 13:2613:26, 27 November 2021DG Regio talk contribs 8,661 bytes −1,126 Removed claim: summary (P836): Réalisation des travaux de la rehausse de l‚évacuateur de crues du barrage de Combani afin de modifier l‘évacuateur en permettant le stockage d‚un volume supplémentaire (élévation de la RN d‘un mètre) tout en Assurant un level de sûreté du barrage conforme aux exigences réglementaires., Removing translation
  • curprev 01:3901:39, 27 November 2021DG Regio talk contribs 9,787 bytes +1,126 Created claim: summary (P836): Réalisation des travaux de la rehausse de l‚évacuateur de crues du barrage de Combani afin de modifier l‘évacuateur en permettant le stockage d‚un volume supplémentaire (élévation de la RN d‘un mètre) tout en Assurant un level de sûreté du barrage conforme aux exigences réglementaires., translated_summary

26 November 2021

24 November 2021

22 November 2021

17 November 2021