Revision history of "Flood control developments on the Neuf Fontaines Creek — construction phase" (Q3696410)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 11:3911:39, 10 October 2024DG Regio talk contribs 44,702 bytes −5 Changed label, description and/or aliases in pt
  • curprev 11:3911:39, 10 October 2024DG Regio talk contribs 44,707 bytes +9 Set a claim value: summary (P836): Na sequência de grandes inundações em Janeiro de 2009, um estudo hidráulico da bacia hidrográfica de Neuf Fontaines Creek definiu um plano de protecção para o município de Réhon. Esta operação consiste nos seguintes projectos de controlo de inundações: execução de trabalhos de renaturalização e consolidação da linha costeira, uma armadilha com doces e o redimensionamento de uma parte da linha coberta pelo riacho no cruzamento de Rehon.

22 March 2024

12 January 2024

11 June 2023

8 June 2023

11 August 2022

  • curprev 22:1222:12, 11 August 2022DG Regio talk contribs 41,444 bytes +27,140 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 10:2310:23, 1 December 2021DG Regio talk contribs 10,119 bytes +1,307 Created claim: summary (P836): Im Anschluss an die schweren Überschwemmungen im Januar 2009 wurde in einer Wasserstudie des Wassereinzugsgebiets des Baches von Neuf Fontaines ein Schutzprogramm für die Gemeinde Réhon festgelegt.Die vorliegende Operation besteht in der Durchführung folgender Hochwasserschutzmaßnahmen: Durchführung von Renaturierungs- und Befestigungsarbeiten an den Ufern, Verkleidungsfalle und Größenänderung eines Teils des überdachten Linears des Baches in de...

27 November 2021

  • curprev 13:0113:01, 27 November 2021DG Regio talk contribs 8,812 bytes −1,325 Removed claim: summary (P836): A la suite d‚importantes inondations en janvier 2009, une étude hydraulique du bassin versant du ruisseau de Neuf Fontaines a défini un programme d‘aménagement de protection de la commune de Réhon.La présente opération consiste à réaliser des aménagements de lutte contre les inondations suivants: mise en oeuvre de travaux de renaturation et de confortement des berges, piège à embâcles, et redimensionnement d’une partie du linéaire couvert du r...
  • curprev 01:0601:06, 27 November 2021DG Regio talk contribs 10,137 bytes +1,325 Created claim: summary (P836): A la suite d‚importantes inondations en janvier 2009, une étude hydraulique du bassin versant du ruisseau de Neuf Fontaines a défini un programme d‘aménagement de protection de la commune de Réhon.La présente opération consiste à réaliser des aménagements de lutte contre les inondations suivants: mise en oeuvre de travaux de renaturation et de confortement des berges, piège à embâcles, et redimensionnement d’une partie du linéaire couvert du rui...

26 November 2021

24 November 2021

22 November 2021

  • curprev 10:3810:38, 22 November 2021DG Regio talk contribs 8,258 bytes +136 Changed label, description and/or aliases in en: translated_label
  • curprev 10:3810:38, 22 November 2021DG Regio talk contribs 8,122 bytes +1,205 Created claim: summary (P836): Following major flooding in January 2009, a hydraulic study of the watershed of Neuf Fontaines Creek defined a protection plan for the commune of Réhon.This operation consists of the following flood control projects: implementation of shoreline renaturation and consolidation work, a trap with jams, and resising a portion of the lineline covered by the creek in the Rehon crossing., translated_summary

17 November 2021