Revision history of "Animation and operational implementation 2016 of the Bourbince territorial contract" (Q3694864)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 00:3200:32, 10 October 2024DG Regio talk contribs 44,289 bytes +3 Changed label, description and/or aliases in pt
  • curprev 00:3200:32, 10 October 2024DG Regio talk contribs 44,286 bytes −3 Set a claim value: summary (P836): A SIBVB realizou um inventário das 42 comunas da bacia hidrográfica de Bourbince em 2012. Isto levou ao desenvolvimento de um contrato territorial. Inicialmente prevista para finais de 2014, a assinatura final do contrato territorial teve lugar em junho de 2015. Dois lugares são dedicados às tarefas de execução do presente contrato territorial: um membro do pessoal (facilitador principal do contrato territorial) e um técnico fluvial.

22 March 2024

7 December 2023

11 August 2022

  • curprev 21:4221:42, 11 August 2022DG Regio talk contribs 41,823 bytes +27,588 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 09:2409:24, 1 December 2021DG Regio talk contribs 10,027 bytes +1,252 Created claim: summary (P836): das SIBVB hat 2012 eine Bestandsaufnahme der 42 Gemeinden im Einzugsgebiet Bourbince vorgenommen. Dies führte zur Ausarbeitung eines Territorialvertrags. Ursprünglich für Ende 2014 geplant, wurde der territoriale Vertrag im Juni 2015 endgültig unterzeichnet. Zwei Stellen sind für die Durchführung dieses Territorialvertrags vorgesehen: ein Missionsbeauftragter (Hauptleiter des Territorialvertrags) und ein Flusstechniker., translated_summary

27 November 2021

  • curprev 12:4912:49, 27 November 2021DG Regio talk contribs 8,775 bytes −1,283 Removed claim: summary (P836): Le SIBVB a procédé à un état des lieux en 2012 sur les 42 communes du bassin versant de la Bourbince. Cela a conduit à l‚élaboration d‘un contrat territorial. Initialisierung prévue fin 2014, la signature définitive du contrat territorial est intervenue en juin 2015. Deux postes sont dédiés aux missions de mise en oeuvre de ce contrat territorial: UN chargé de mission (animateur principal du Contrat Territorial) et un technicien de rivière.,...
  • curprev 00:5800:58, 27 November 2021DG Regio talk contribs 10,058 bytes +1,283 Created claim: summary (P836): Le SIBVB a procédé à un état des lieux en 2012 sur les 42 communes du bassin versant de la Bourbince. Cela a conduit à l‚élaboration d‘un contrat territorial. Initialisierung prévue fin 2014, la signature définitive du contrat territorial est intervenue en juin 2015. Deux postes sont dédiés aux missions de mise en oeuvre de ce contrat territorial: UN chargé de mission (animateur principal du Contrat Territorial) et un technicien de rivière., tr...

26 November 2021

24 November 2021

22 November 2021

  • curprev 10:2610:26, 22 November 2021DG Regio talk contribs 8,213 bytes +142 Changed label, description and/or aliases in en: translated_label
  • curprev 10:2610:26, 22 November 2021DG Regio talk contribs 8,071 bytes +1,239 Created claim: summary (P836): SIBVB carried out an inventory of the 42 communes in the Bourbince watershed in 2012. This led to the development of a territorial contract. Initially scheduled for late 2014, the final signature of the territorial contract took place in June 2015. Two posts are dedicated to the implementation tasks of this territorial contract: a staff member (lead facilitator of the Territorial Contract) and a river technician., translated_summary

17 November 2021