Revision history of "Support to finance the management of the workshop and integration site Various activities 2017" (Q3691608)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 11:3211:32, 11 October 2024DG Regio talk contribs 82,595 bytes −2 Changed label, description and/or aliases in pt
  • curprev 11:3111:31, 11 October 2024DG Regio talk contribs 82,597 bytes −30 Set a claim value: summary (P836): As oficinas de integração promovem a retoma do emprego remunerado de candidatos a emprego em dificuldade, beneficiários do RSA ou dos mínimos sociais. O Estreito de Berruyère permite a criação de uma situação de trabalho em CDDI (Contrato com Duração Determinada da Inserção), por períodos de 6 meses renováveis, às 24h semanais, numa das 4 atividades seguintes: Edifício de segunda obra e manutenção: Trabalhos de pintura, colocação de papel de pintura...

22 March 2024

7 December 2023

19 June 2023

12 June 2023

11 August 2022

  • curprev 20:4820:48, 11 August 2022DG Regio talk contribs 80,200 bytes +56,372 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

31 January 2022

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 09:1409:14, 1 December 2021DG Regio talk contribs 14,783 bytes +2,738 Created claim: summary (P836): Die Integrationsworkshops fördern die Wiederaufnahme der unselbständigen Erwerbstätigkeit von Arbeitsuchenden in Schwierigkeiten, Bezieher des RSA oder der sozialen Minimas. Die „Entraide berruyère“ ermöglicht es, in einem der folgenden vier Tätigkeiten für einen Zeitraum von 6 Monaten, der auf 24 Stunden pro Woche verlängert werden kann, die Arbeit auf CDDI (Determined Insertion Contract) in Arbeit zu bringen: \- Bau- und Wartungsarbeiten: La...

27 November 2021

  • curprev 13:3113:31, 27 November 2021DG Regio talk contribs 12,045 bytes −2,739 Removed claim: summary (P836): Les ateliers d‚insertion favorisent la reprise d‘activité salariée des demandeurs d’emploi en difficulté, allocataires du RSA ou des minimas sociaux. L‚Entraide Berruyère permet la mise en situation de travail en CDDI (Contrat à Durée Déterminée d‘Insertion), pour des périodes de 6 mois renouvelables, à 24h hebdomadaires, sur l’une des 4 activités suivantes: \- Second-Oeuvre bâtiment et maintenance: Travaux de peinture, pose de papier-peint,...
  • curprev 00:4000:40, 27 November 2021DG Regio talk contribs 14,784 bytes +2,739 Created claim: summary (P836): Les ateliers d‚insertion favorisent la reprise d‘activité salariée des demandeurs d’emploi en difficulté, allocataires du RSA ou des minimas sociaux. L‚Entraide Berruyère permet la mise en situation de travail en CDDI (Contrat à Durée Déterminée d‘Insertion), pour des périodes de 6 mois renouvelables, à 24h hebdomadaires, sur l’une des 4 activités suivantes: \- Second-Oeuvre bâtiment et maintenance: Travaux de peinture, pose de papier-peint, p...

26 November 2021

24 November 2021

22 November 2021

  • curprev 11:3411:34, 22 November 2021DG Regio talk contribs 11,432 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 10:1610:16, 22 November 2021DG Regio talk contribs 10,999 bytes +153 Changed label, description and/or aliases in en: translated_label
  • curprev 10:1610:16, 22 November 2021DG Regio talk contribs 10,846 bytes +2,544 Created claim: summary (P836): The integration workshops promote the resumption of paid employment of jobseekers in difficulty, beneficiaries of the RSA or the social minima. The Berruyère Straide allows the setting up of a working situation in CDDI (Contract with Determined Duration of Insertion), for periods of 6 months renewable, at 24h weekly, on one of the following 4 activities: \- Second-work building and maintenance: Painting work, laying of paint paper, laying of s...

17 November 2021