Revision history of "Development of EuroVelo n°5 between 11/19 and the Glissoires Park in Lens" (Q3688129)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 11:3511:35, 10 October 2024DG Regio talk contribs 45,534 bytes −2 Changed label, description and/or aliases in pt
  • curprev 11:3511:35, 10 October 2024DG Regio talk contribs 45,536 bytes −1 Set a claim value: summary (P836): A construção de um troço do EuroVelo 5 de 12 km pela Comunidade da aglomeração de Lens Liévin (CALL) assegurará a continuidade pedonal e ciclável entre o Parc des Glissoires e a base do 11/19. Esta operação permitirá a circulação de modos ativos num itinerário seguro e confortável, no próprio local da bicicleta e no pavimento, ligados às redes de ciclismo existentes.

7 March 2024

12 January 2024

7 December 2023

19 June 2023

12 June 2023

8 June 2023

11 August 2022

  • curprev 19:3619:36, 11 August 2022DG Regio talk contribs 40,266 bytes +26,705 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 09:0209:02, 1 December 2021DG Regio talk contribs 9,486 bytes +1,241 Created claim: summary (P836): Die Errichtung eines 12 km langen Abschnitts des EuroVelo 5 durch die Gemeindegemeinschaft Lens Liévin (CALL) wird eine Fußgänger- und Raddurchlässigkeit zwischen dem Parc des Glissoires und der Basis 11/19 gewährleisten. Dies ermöglicht den Verkehr aktiver Verkehrsträger auf einer sicheren und komfortablen Route auf dem eigenen Radweg und auf der Straße, die mit den bestehenden Fahrradnetzen verbunden ist., translated_summary

27 November 2021

  • curprev 14:0914:09, 27 November 2021DG Regio talk contribs 8,245 bytes −1,232 Removed claim: summary (P836): La réalization d‚un tronçon de l‘EuroVelo 5 de 12 km par la Communauté d’agglomération de Lens Liévin (CALL) sichertra une continuité piétonne et cyclable entre le parc des Glisssoires et la base du 11/19. Cette opération permettra la circulation des mode actifs sur un itinéraire sécurisé et confortable, sur site propre cyclable et sur chaussée, connecté aux réseaux cyclables existants., Removing translation
  • curprev 00:1900:19, 27 November 2021DG Regio talk contribs 9,477 bytes +1,232 Created claim: summary (P836): La réalization d‚un tronçon de l‘EuroVelo 5 de 12 km par la Communauté d’agglomération de Lens Liévin (CALL) sichertra une continuité piétonne et cyclable entre le parc des Glisssoires et la base du 11/19. Cette opération permettra la circulation des mode actifs sur un itinéraire sécurisé et confortable, sur site propre cyclable et sur chaussée, connecté aux réseaux cyclables existants., translated_summary

26 November 2021

24 November 2021

22 November 2021

  • curprev 10:1110:11, 22 November 2021DG Regio talk contribs 7,675 bytes +133 Changed label, description and/or aliases in en: translated_label
  • curprev 10:1110:11, 22 November 2021DG Regio talk contribs 7,542 bytes +1,206 Created claim: summary (P836): The construction of a section of EuroVelo 5 of 12 km by the Community of agglomeration of Lens Liévin (CALL) will ensure pedestrian and cycling continuity between the Parc des Glissoires and the base of 11/19. This operation will allow the circulation of active modes on a safe and comfortable itinerary, on the own bike site and on pavement, connected to existing cycling networks., translated_summary

17 November 2021