Revision history of "MATECOM — Phase 5" (Q3686534)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

7 December 2023

10 June 2023

11 August 2022

  • curprev 18:5418:54, 11 August 2022DG Regio talk contribs 35,663 bytes +21,965 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 08:5508:55, 1 December 2021DG Regio talk contribs 10,381 bytes +1,010 Created claim: summary (P836): Phase 5 des Projekts MATECOM soll wissenschaftliche Ausrüstung für die molekulare Analyse erwerben. Dies wird es ermöglichen, die Leistung dieser reaktiven Flächen zu charakterisieren., translated_summary

27 November 2021

  • curprev 12:5312:53, 27 November 2021DG Regio talk contribs 9,371 bytes −1,032 Removed claim: summary (P836): La phase 5 du projet MATECOM a pour objectif d‚acquérir des équipements scientifiques pour l‘analyse moléculaire. Cette acquisisiton permettra de caractérizer les performances de ces surface réactives., Removing translation
  • curprev 00:1100:11, 27 November 2021DG Regio talk contribs 10,403 bytes +1,032 Created claim: summary (P836): La phase 5 du projet MATECOM a pour objectif d‚acquérir des équipements scientifiques pour l‘analyse moléculaire. Cette acquisisiton permettra de caractérizer les performances de ces surface réactives., translated_summary

26 November 2021

24 November 2021

22 November 2021

18 November 2021

17 November 2021