Revision history of "Extension of the tip of the thrushes — Main wharf" (Q3686505)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

7 December 2023

10 June 2023

18 July 2022

  • curprev 12:2512:25, 18 July 2022DG Regio talk contribs 43,721 bytes +28,084 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 08:5408:54, 1 December 2021DG Regio talk contribs 11,315 bytes +1,297 Created claim: summary (P836): mit diesem Projekt zur Erweiterung der Pointe des Grives (Gegenstand dieses Antrags) soll der erste Teil der Anpassung der Speicherkapazität des Terminals an das Umschlagspotenzial ergänzt werden. Dieses Programm reagiert auf die Herausforderungen der Anpassung an den Verkehr nach Panama und der Feederisierung. Es geht darum, die Entwicklung des Verkehrs vorzubereiten und zu antizipieren. Die Hafeninfrastruktur muss modernisiert werden, um größe...

27 November 2021

  • curprev 14:0614:06, 27 November 2021DG Regio talk contribs 10,018 bytes −1,326 Removed claim: summary (P836): CE projet d‚extension de la Pointe des Grives (objet de cette demande), a pour objectif de compléter le premier volet d‘adaptation de la capacité de traitement de traitement de stockage du terminal au regard du potentiel trafic de transbordement. CE-Programm répond aux enjeux d’adaptation au trafic post Panama et de feederization. Il s‚agit de préparer et Anticiper l‘évolution de trafics. L’infrastructure portuaire doit se modernizer pour accu...
  • curprev 00:1100:11, 27 November 2021DG Regio talk contribs 11,344 bytes +1,326 Created claim: summary (P836): CE projet d‚extension de la Pointe des Grives (objet de cette demande), a pour objectif de compléter le premier volet d‘adaptation de la capacité de traitement de traitement de stockage du terminal au regard du potentiel trafic de transbordement. CE-Programm répond aux enjeux d’adaptation au trafic post Panama et de feederization. Il s‚agit de préparer et Anticiper l‘évolution de trafics. L’infrastructure portuaire doit se modernizer pour accuei...

26 November 2021

24 November 2021

22 November 2021

18 November 2021

  • curprev 18:0118:01, 18 November 2021DG Regio talk contribs 9,053 bytes +110 Changed label, description and/or aliases in en: translated_label
  • curprev 18:0118:01, 18 November 2021DG Regio talk contribs 8,943 bytes +1,266 Created claim: summary (P836): this project to extend the Pointe des Grives (subject of this request) aims to complete the first phase of adaptation of the terminal’s storage processing capacity in view of the potential for transhipment traffic. This program responds to the challenges of adapting to post Panama traffic and feederisation. The aim is to prepare and anticipate the evolution of traffic. Port infrastructure needs to be modernised to accommodate larger ships, trans...
  • curprev 09:4109:41, 18 November 2021DG Regio talk contribs 7,677 bytes +516 Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes

17 November 2021