Revision history of "Restructuring of 4 buildings of the Residence Le Bois Charron comprising 70 accommodation in CADA (batiments A-B-C) and CHRS (batiment D) in Laon" (Q3684159)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

12 January 2024

9 June 2023

8 June 2023

11 August 2022

  • curprev 17:5717:57, 11 August 2022DG Regio talk contribs 58,413 bytes +40,060 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 08:2708:27, 1 December 2021DG Regio talk contribs 12,082 bytes +1,964 Created claim: summary (P836): Das Vorhaben besteht in der Umstrukturierung von vier Gebäuden am Standort Bois Charron in Laon, bestehend aus einem Aufnahmezentrum für Asylsuchende (CADA) mit 104 Plätzen (Gebäude A, B und C) und einem Zentrum für Unterkunft und soziale Wiedereingliederung (CHRS) mit 13 Plätzen (Gebäude D). Das fünfte Gebäude, das heute von einem Foyer de Jeunes Travailleurs genutzt wird, ist im Zusammenhang mit der Umstrukturierung des Standorts nicht unmitte...

27 November 2021

  • curprev 12:5612:56, 27 November 2021DG Regio talk contribs 10,118 bytes −1,935 Removed claim: summary (P836): L‚opération consiste à restructurer 4 bâtiments sur le site du Bois Charron à Laon, comprenant un Centre d‘Accueil des Demandeurs d‚Asile (CADA) de 104 Plätze (Bâtiments A, B et C) et d‘un Centre d’Hébergement et de Réinsertion Sociale (CHRS) de 13 Plätze (Bâtiment D). Le 5ème bâtiment aujourd‚hui occupé par un Foyer de Jeunes Travailleurs n‘est pas concerné directement dans le cadre de la restructuration du site puisqu‚il est transféré sur un...

26 November 2021

  • curprev 23:5823:58, 26 November 2021DG Regio talk contribs 12,053 bytes +1,935 Created claim: summary (P836): L‚opération consiste à restructurer 4 bâtiments sur le site du Bois Charron à Laon, comprenant un Centre d‘Accueil des Demandeurs d‚Asile (CADA) de 104 Plätze (Bâtiments A, B et C) et d‘un Centre d’Hébergement et de Réinsertion Sociale (CHRS) de 13 Plätze (Bâtiment D). Le 5ème bâtiment aujourd‚hui occupé par un Foyer de Jeunes Travailleurs n‘est pas concerné directement dans le cadre de la restructuration du site puisqu‚il est transféré sur un a...
  • curprev 15:1915:19, 26 November 2021DG Regio talk contribs 10,118 bytes +208 Changed label, description and/or aliases in de: translated_label

24 November 2021

18 November 2021

  • curprev 17:4117:41, 18 November 2021DG Regio talk contribs 9,479 bytes +205 Changed label, description and/or aliases in en: translated_label
  • curprev 17:4117:41, 18 November 2021DG Regio talk contribs 9,274 bytes +1,805 Created claim: summary (P836): The operation consists of restructuring 4 buildings on the Bois Charron site in Laon, including a 104-seat Welcome Centre for Asylum Claimers (CADA) (Buildings A, B and C) and a 13-seat Housing and Social Reintegration Centre (CHRS). The 5th building now occupied by a Foyer de Jeunes Travailleurs is not directly concerned as part of the restructuring of the site since it is transferred to another site, the contracting authority of which, for its...

17 November 2021