Revision history of "Demolition of the Foyer des Travailleurs Migrants and reconstruction of a Social Residence of 90 dwellings and a CADA of 38 dwellings 11 rue Marcel Coquet in Méru" (Q3684150)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 02:1302:13, 9 October 2024DG Regio talk contribs 53,077 bytes +3 Changed label, description and/or aliases in pt
  • curprev 02:1302:13, 9 October 2024DG Regio talk contribs 53,074 bytes −12 Set a claim value: summary (P836): A operação baseia-se na demolição de uma antiga casa para trabalhadores migrantes, obsoleta e inadequada para as necessidades do público de acolhimento, que a Hlm Coallia adquiriu para garantir o domínio de um projeto de demolição de reconstrução, para criar, em vez disso, uma residência social de 90 habitações e um centro de acolhimento para requerentes de asilo (CADA) de 38 habitações. O desafio é combater a exclusão social. O projeto faz parte de...

22 March 2024

12 January 2024

7 December 2023

9 June 2023

8 June 2023

11 August 2022

  • curprev 17:5717:57, 11 August 2022DG Regio talk contribs 49,821 bytes +33,734 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 08:2708:27, 1 December 2021DG Regio talk contribs 10,924 bytes +1,521 Created claim: summary (P836): Die Operation basiert auf dem Abriss eines ehemaligen Heims von Wanderarbeitnehmern, die veraltet und nicht den Bedürfnissen der aufgenommenen Zielgruppen angepasst sind, die die SA Hlm Coallia erworben hat, um die Bauleitung eines Abrissprojekts zu gewährleisten, statt dessen eine Sozialwohnung mit 90 Wohnungen und ein Aufnahmezentrum für Asylsuchende (CADA) mit 38 Wohnungen zu schaffen. Es geht darum, die soziale Ausgrenzung zu bekämpfen. Das...

27 November 2021

  • curprev 12:5412:54, 27 November 2021DG Regio talk contribs 9,403 bytes −1,653 Removed claim: summary (P836): L‚opération repose sur la démolition d‘un ancien foyer de travailleursmigranten, vétuste et inadapté aux besoins des publics accueillis, que la SA Hlm Coallia a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis d‚ouvrage d‘un projet de démolition Rekonstruktion, pour créer en lieu et place une résidence sociale de 90 logements et un ce...

26 November 2021

  • curprev 23:5823:58, 26 November 2021DG Regio talk contribs 11,056 bytes +1,653 Created claim: summary (P836): L‚opération repose sur la démolition d‘un ancien foyer de travailleursmigranten, vétuste et inadapté aux besoins des publics accueillis, que la SA Hlm Coallia a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis a acquis d‚ouvrage d‘un projet de démolition Rekonstruktion, pour créer en lieu et place une résidence sociale de 90 logements et un cent...
  • curprev 15:1915:19, 26 November 2021DG Regio talk contribs 9,403 bytes +216 Changed label, description and/or aliases in de: translated_label

24 November 2021

18 November 2021

  • curprev 17:5817:58, 18 November 2021DG Regio talk contribs 8,756 bytes +223 Changed label, description and/or aliases in en: translated_label
  • curprev 17:5817:58, 18 November 2021DG Regio talk contribs 8,533 bytes +1,434 Created claim: summary (P836): The operation is based on the demolition of a former home for migrant workers, which is outdated and unsuitable for the needs of the host public, which Hlm Coallia acquired to ensure the mastery of a reconstruction demolition project, to create instead a social residence of 90 dwellings and a reception centre for asylum seekers (CADA) of 38 dwellings. The challenge is to combat social exclusion. The project is part of a process of improving the...

17 November 2021