Revision history of "Energy renovation of 24 social housing units located Impasse du Dr Rouanet in Moissac (82)" (Q3683063)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

22 March 2024

12 January 2024

19 June 2023

10 June 2023

8 June 2023

11 August 2022

  • curprev 17:2517:25, 11 August 2022DG Regio talk contribs 36,542 bytes +24,012 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 08:3608:36, 1 December 2021DG Regio talk contribs 8,947 bytes +1,042 Created claim: summary (P836): Das Vorhaben betrifft die „Energierenovierung von 24 Sozialwohnungen in der Impasse von Dr. Rouanet in Moissac (82)“. Der voraussichtliche Durchführungszeitraum des Vorhabens läuft vom 1.10.2018 bis zum 31.12.2020., translated_summary

27 November 2021

  • curprev 14:0114:01, 27 November 2021DG Regio talk contribs 7,905 bytes −1,051 Removed claim: summary (P836): L’opération concerne la „rénovation énergétique de 24 logements sociaux situés Impasse du docteur Rouanet à Moissac (82)“. La période de réalization prévisionnelle de l’opération est du 01/10/2018 au 31/12/2020., Removing translation

26 November 2021

24 November 2021

18 November 2021

17 November 2021