Revision history of "SOLIAE insertion site" (Q3678979)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

7 December 2023

12 June 2023

11 August 2022

  • curprev 15:3915:39, 11 August 2022DG Regio talk contribs 60,231 bytes +40,612 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

31 January 2022

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 07:4707:47, 1 December 2021DG Regio talk contribs 12,877 bytes +2,183 Created claim: summary (P836): Falls die Maßnahme in getrennte Aktionen unterteilt ist, nennen Sie den Titel und erläutern Sie, wie diese Aktionen für die Durchführung Ihres Projekts miteinander verknüpft sind (für den Inhalt der Aktionen wird ein Arbeitsbogen pro Aktion erstellt) Die Aktion PLIE Einbettungswerft Soliaë soll die Aufnahme von mindestens drei PLIE-Teilnehmern ermöglichen, die gleichzeitig von der PLIE oder der örtlichen Mission auf der Produktionsanlage für Blu...

27 November 2021

  • curprev 12:3012:30, 27 November 2021DG Regio talk contribs 10,694 bytes −2,099 Removed claim: summary (P836): SI l‚opération se décompose en actions distinctes, citez leur intitulé et expliquez l‘articulation entre ces actions pour la mise en œuvre de votre projet (le contenu des actions fera l‚objet d‘une fiche par action) L‚action PLIE chantier d‘insertion Soliaë a pour objectif de permettre l‚accueil de 3 Teilnehmer PLIE au minimum simultanément Orientés par le PLIE ou par la mission locale sur le chantier d‘insertion de production florale. L’acti...

26 November 2021

  • curprev 23:1123:11, 26 November 2021DG Regio talk contribs 12,793 bytes +2,099 Created claim: summary (P836): SI l‚opération se décompose en actions distinctes, citez leur intitulé et expliquez l‘articulation entre ces actions pour la mise en œuvre de votre projet (le contenu des actions fera l‚objet d‘une fiche par action) L‚action PLIE chantier d‘insertion Soliaë a pour objectif de permettre l‚accueil de 3 Teilnehmer PLIE au minimum simultanément Orientés par le PLIE ou par la mission locale sur le chantier d‘insertion de production florale. L’action...
  • curprev 14:4514:45, 26 November 2021DG Regio talk contribs 10,694 bytes +79 Changed label, description and/or aliases in de: translated_label

24 November 2021

22 November 2021

18 November 2021

  • curprev 16:4016:40, 18 November 2021DG Regio talk contribs 9,751 bytes +80 Changed label, description and/or aliases in en: translated_label
  • curprev 16:4016:40, 18 November 2021DG Regio talk contribs 9,671 bytes +1,974 Created claim: summary (P836): If the operation is broken down into separate actions, give their title and explain the relationship between these actions for the implementation of your project (the content of the actions will be the subject of one action fiche) The Soliaë insertion site PLIE action aims to accommodate at least 3 PLIE participants simultaneously guided by the PLIE or by the local mission on the site of insertion of floral production. The action shall include:...

17 November 2021