Revision history of "Requalification of Bernon Shopping Centre" (Q3678650)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 02:0302:03, 9 October 2024DG Regio talk contribs 61,357 bytes +10 Set a claim value: summary (P836): A cidade de Epernay quis dotar-se dos meios necessários para concluir a renovação do bairro de Berna (o bairro prioritário da cidade), a fim de promover a sua atratividade e transformar a imagem deste bairro no final da PRU. A requalificação do Centro Comercial Bernon visa reabilitar a parte na extremidade EST do antigo centro comercial, parcialmente dedicada à demolição, de uma área de 350 m2 no terreno. O rés-do-chão, atualmente constituído por lo...

23 March 2024

12 January 2024

7 December 2023

9 June 2023

8 June 2023

11 August 2022

  • curprev 15:3015:30, 11 August 2022DG Regio talk contribs 58,092 bytes +39,972 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 07:4807:48, 1 December 2021DG Regio talk contribs 11,975 bytes +1,951 Created claim: summary (P836): Die Stadt Epernay wollte sich die Mittel an die Hand geben, die Renovierung des Viertels Bernon (vorrangiges Viertel der Stadt) abzuschließen, um seine Attraktivität zu steigern und das Image dieses Viertels nach Ablauf des PRU zu verändern. Ziel der Umqualifizierung des Einkaufszentrums Bernon ist die Sanierung des Teils am TSE-Ende des zum Teil zum Abriss bestimmten Einkaufszentrums mit einer Fläche von 350 m² am Boden. Das Erdgeschoss, das de...

27 November 2021

  • curprev 13:2813:28, 27 November 2021DG Regio talk contribs 10,024 bytes −2,075 Removed claim: summary (P836): La Ville d‚Epernay a souhaité se donner les moyens de finaliser la rénovation du quartier Bernon (quartier prioritaire de la ville) afin de favorizer son attractivité et de transformer l‘image de ce quartier à l’échéance du PRU. L‚opération de requalification du center commercial Bernon vise à réhabiliter la partie située à l‘extrémité EST de l‚ancien center commercial, partiellement Voué à la démolition, d‘une superficie de 350m2au sol. Le re...

26 November 2021

  • curprev 23:1023:10, 26 November 2021DG Regio talk contribs 12,099 bytes +2,075 Created claim: summary (P836): La Ville d‚Epernay a souhaité se donner les moyens de finaliser la rénovation du quartier Bernon (quartier prioritaire de la ville) afin de favorizer son attractivité et de transformer l‘image de ce quartier à l’échéance du PRU. L‚opération de requalification du center commercial Bernon vise à réhabiliter la partie située à l‘extrémité EST de l‚ancien center commercial, partiellement Voué à la démolition, d‘une superficie de 350m2au sol. Le rez-...
  • curprev 14:4214:42, 26 November 2021DG Regio talk contribs 10,024 bytes +104 Changed label, description and/or aliases in de: translated_label

24 November 2021

18 November 2021

  • curprev 17:1117:11, 18 November 2021DG Regio talk contribs 9,489 bytes +100 Changed label, description and/or aliases in en: translated_label
  • curprev 17:1117:11, 18 November 2021DG Regio talk contribs 9,389 bytes +1,879 Created claim: summary (P836): The City of Epernay wanted to give itself the means to finalise the renovation of the Bernon district (the city’s priority district) in order to promote its attractiveness and transform the image of this district at the end of the PRU. The requalification of Bernon Shopping Centre aims to rehabilitate the part at the EST end of the former commercial centre, partly dedicated to demolition, of an area of 350 m² on the ground. The ground floor, cur...

17 November 2021