Revision history of "MTM2" (Q3542423)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

16 February 2024

12 June 2023

10 August 2022

  • curprev 23:2523:25, 10 August 2022DG Regio talk contribs 51,636 bytes +33,959 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

23 January 2022

20 January 2022

21 December 2021

9 December 2021

21 November 2021

18 November 2021

17 November 2021

  • curprev 23:0323:03, 17 November 2021DG Regio talk contribs 9,696 bytes +62 Changed label, description and/or aliases in en: translated_label
  • curprev 23:0323:03, 17 November 2021DG Regio talk contribs 9,634 bytes +1,584 Created claim: summary (P836): MTM (Methods-Time Measurement) is a method for analysing workflows and determining schedule and default times. MTM is used to plan manual workflows. It is important to determine how long a person needs for certain activities during the planning phase. Each motion sequence is divided into a series of basic movements, such as grasping, grasping, laying off, letting go. Then the target times are analysed and calculated. The simplified version of t...

7 November 2021

6 November 2021