Revision history of "Health Network of the BEMPOSTA-OLIVEIRA PINESS OF AZEMIES — Good Pine Subsystem" (Q3389385)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

14 June 2023

23 May 2023

8 November 2022

10 August 2022

  • curprev 02:5702:57, 10 August 2022DG Regio talk contribs 42,246 bytes +26,171 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 June 2022

14 February 2022

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

29 November 2021

  • curprev 19:4219:42, 29 November 2021DG Regio talk contribs 8,196 bytes +1,255 Created claim: summary (P836): This operation aims at the installation of the drainage network of residual waters in locations not yet served, namely in the parish of Pinheiro da Bemposta, including the construction of a WWTP that will treat the collected effluent. The realisation of the operation allows the arrival of an additional 2 093 inhabitants, which translates into an increase in the coverage rate in the order of 3.1 % in the municipality as a whole., translated_summary
  • curprev 19:4219:42, 29 November 2021DG Regio talk contribs 6,941 bytes +140 Changed label, description and/or aliases in en: translated_label

26 October 2021